House Plan Approval Process in Malda
Before construction, the required approval route depends on whether the plot falls within a municipal or panchayat area. Start by confirming the authority, plot documents and drawing requirements.
Common preparation steps
- Collect ownership, mutation or land record and tax documents.
- Confirm plot dimensions, road access and site details.
- Prepare the architectural and supporting drawings.
- Submit the required set to the relevant authority.
- Keep the approved drawings available during construction.
Requirements and timelines vary. A R Building Planner can help prepare the drawings and explain the submission set.
Related: Sanction Drawings ยท Architectural Plans
